Photographed monthly from Sector 117

The construction record

Every frame we have taken at Highland Mayfields, dated, newest first. No developer updates, no renders — just what was standing on the day we stood there.

Structure
14 of 228 floors remaining
Towers
2 of 3Under construction
Last visit
1 October 2026Next due in October
RERA
PBRERA-SAS80-PR1041rera.punjab.gov.in
1 October 2026 14 of 22 floors

The fourteenth floor is nearly complete, as reported from site, with the tower crane and formwork on top. The sample flat on the first floor is at putty and finishing stage: false ceilings formed, black-framed sliding doors to the balconies fitted, electrical points chased. The commercial block beside the PR-6 entrance, which will house Highland's sales office, has its arched glazing in. On the PR-7 side, the Airport Road entrance court with its fountain and landscaping is finished; the third tower will come up on that side later.

Highland Mayfields tower under construction with tower crane, October 2026
Tower under construction with the tower crane
Tower
Tower seen from the road, behind the project signboard
From the road
Tower seen across the park, crane on top
Across the park
Sample flat living room at putty stage, false ceiling formed
Sample flat
Sample flat bedroom with sliding doors to the balcony
Bedroom
Sample flat room with three-panel sliding door
Second room
Sample flat washroom, wall tiles fixed
Washroom
Sample flat washroom, concealed cistern frame in place
Second washroom
Commercial block beside the PR-6 entrance, arched glazing in
Commercial block
Rear of the commercial block, seen from the tower
From the tower
PR-7 Airport Road entrance court with fountain
PR-7 entrance
Project hoarding at the site entrance
Hoarding
12 September 2026 12 of 22 floors

The two towers under construction are up to the twelfth floor, lift cores standing above the topmost slab, crane and concrete pump in use. Commercial block beside the PR-6 entrance being finished. A sample flat on the first floor being finished, and services first-fix running in the ground-floor common areas.

Highland Mayfields towers under construction, September 2026
Both towers under construction
Both towers
Lift core standing above the topmost slab
Lift core
Balcony profiles and placing boom on the facade
Facade
Commercial block beside the PR-6 entrance
Commercial block
Ducting and fire line first-fix, ground floor
Services
Sample flat drawing room onto a balcony being tiled
Sample flat
Sample flat on the first floor being finished
Sample flat
Joinery under way in the sample flat
Woodwork
Sample flat bathroom at first fix
Washroom
The commercial block seen from an apartment
From a flat
The signboard seen from inside the campus
From the campus
Both towers seen from the PR-6 side
From PR-6
View from the site towards the Shivalik hills
Shivaliks

How this record is made

Our office is in Sector 117, under a kilometre from the site. Once a month we walk over and photograph whatever is there — the towers from a fixed spot on the road, the clubhouse, whichever floors are being finished, and the services going in. Every frame is dated and published here whether or not it flatters the project.

Floor counts are what site staff tell us on the day, not what we count off a photograph and not what the developer publishes. Where the two differ we say so.

We have a commercial interest in Highland Mayfields and this record exists partly because it is useful to us. It is also the only independent, dated photographic record of this project that we know of, and it is more use to you than a brochure. Judge it on that basis.